Healthy-home design-build in San Antonio, Texas
Bexar County · San Antonio metro · Climate zone 2A
San Antonio is the southern anchor. The city adopted the 2024 residential code by ordinance effective 1 May 2025 but retained the 2021 IECC for energy, and it uses RESNET raters for the energy inspections rather than folding them into the general inspection list. That split matters: the energy verification is performed by a third party on a separate schedule from the city's structural and mechanical inspections.
North of the city the Edwards Recharge Zone brings TCEQ, the Unified Development Code, and SAWS rules to bear on the same site at once. We treat that stack as a scheduling problem, not a surprise, and we sort it before design is locked.
Jurisdiction facts
Authority of record: San Antonio. Every row below is transcribed from the primary source linked at the bottom of this panel. Anything we could not confirm is flagged rather than stated.
- Adopted residential code
- 2024 (Ord. 2025-01-30-0075, eff. 2025-05-01)
- Energy code
- 2021 IECC retained; RESNET rater energy inspections
- Permit portal
- BuildSA (Accela)
- Inspection regime
- City building department performs the inspections.
- Overlays and site programmes
- Edwards Recharge (TCEQ 213 + UDC 35-332 ERZD + SAWS Ord. 81491); floodplain
- County
- Bexar
- Climate zone (2015-era map)
- 2A
- Climate zone (2021-era map)
- Pending Verification
Source: https://docsonline.sanantonio.gov/DSDUploads/2024Ch10Building-RelatedCodesFinal.pdf · Last verified August 29, 2026 · Full single-family inspection list per IB 130; energy inspections per IB 167.
Climate-zone note
San Antonio sits in climate zone 2A on the 2015-era map — hot and humid. For most of the year the moisture drive runs from outside toward the interior, which is the opposite of the cold-climate assumption most published detailing is written around. That single fact governs where the vapour control belongs, how a wall is expected to dry, and why an interior polyethylene layer is the wrong answer here.
The 2021-era zone designation for this jurisdiction is not settled in our record and carries a Pending Verification flag. It does not change how we detail an assembly, but it can change which code table applies, so we confirm it before submittal rather than assume it.
What we run into here
- Climate zone 2A, with the same inward vapour drive that governs the rest of the corridor.
- Recharge-zone sites in the northern reaches carry water-quality obligations that affect grading and drainage before they affect the house.
- A large volume of production housing where the original air barrier and duct work are the first things worth testing.